-
Project Location: Izmit - Türkiye
-
Client: STFA Insaat / Ayson Geoteknik
-
Start Date: 04.2013
-
Completion Date: 11.2014
Izmit Bay Crossing South Anchorage Temporary D-Wall Instrumentation Works, Automatic Data Logging and Reporting in the scope of the Izmit Bay Suspension Bridge Project.
105MN Axial Pile Load Test (Bi-Directional Static Load Test, BDSLT) has been performed on the 2000/1850 mm diameter Bored Pile in the scope of the North Side Span Pier Pile No:P3 Bi-directional Static Loading Test.
Instrumentation equipment supply (Shape Accellerometer Array) to determine 3D Absolute Position and supervising service.